• Injection Molded Double Urn Septic Tank

    We have successively produced a series of products including plastic one-time molded inspection wells for municipal and construction area drainage, resin manhole covers, ductile iron manhole covers, hollow wall wrapped pipe shafts, HDPE double-wall corrugated pipes, HDPE steel belt reinforced corrugated pipes, plastic-steel wrapped pipes, plastic septic tanks, rainwater collection, etc. The company produces Mpp power pipes, PE water pipes, PE gas pipes and fittings, and undertakes the construction of underground pipeline projects.

Integrated injection molded double urn hopper septic tanks
Contact Us

Key Features:

1. The volume is 1.0-1.5m3, which meets the standard of "o/swY010-2015 Double-urn Funnel Septic Tank".

2. Advanced design concept, sewage circulation flow. The sewage treatment capacity is at least twice that of traditional septic tanks of the same volume.

3. Optimized structural design, mature process technology, high product strength, acid and alkali resistance, and corrosion resistance.

4. Save water. The water consumption for each flushing of the toilet is about 0.3 liters.

5. No odor, no maggots, no leakage, and no groundwater pollution.

6. The product has good sealing and firmness, ensuring the function of anaerobic manure.

7. Treat feces harmlessly to avoid the spread of various diseases, prevent pollution of air, soil and water, and protect the environment.

8. Lightweight, easy to transport, quick and easy to install.

9. Save labor, save time, and have a long service life.

Installation Instructions:

1. Dig a 2m long, 1.1m wide and 1.8m deep rectangular pit outside the toilet corresponding to the position of the squat toilet or toilet in the room, and use 50mm concrete as the foundation. 2. After placing the sealing gasket at the joint, first joint the urn body and then reinforce it with screws.

3. Place the urn into the pit dug in the toilet, fill and tamp the area around the urn with fine soil to prevent it from collapsing or tilting. The urn should be 5-10 cm above the ground, and the area around the urn cover should be reinforced with cement mortar to prevent seepage and fixation.

4. Adjust the position of the manure pipe opening, connect the urns with manure pipes, and

The body joints are connected with special pipe fittings to play a role in anti-seepage and fixing.

5. Please adjust the bottom of the high-pressure flushing device first. The bottom should be completely consistent with the high-pressure flushing device and cannot shake. Adjust the foot pedal to ensure its stability. Check whether the water hose and the lock are firm. The depth should be based on the top of the high-pressure flushing device being slightly higher than the ground (about 20mm).

6. The water pipe connecting the high-pressure flush toilet and the squat toilet (the part exposed outside the bucket) should be as short as possible, without bending or sagging, and the flushing port of the squat toilet should be higher than the water storage bucket (there must be a height difference). Otherwise, the water pipe will accumulate water in winter and cause freezing and cracking.

7. The front end of the squat toilet should be slightly higher than the back end by 5-10mm. Tamp the area around the squat toilet with fine sand and then level it with 2 cm cement mortar.

8. The straight-line distance between the toilet exit and the front urn entrance is less than 1.2 meters, and the height difference between the toilet and the urn is between 0.3 and 0.5 meters.

Product Center

Leave a Message Online

SEND

Leave a Message Online

SEND

*We respect your privacy and are committed to protecting it by adhering to our Privacy Policy.